Budget form prep

This form is for the prep. It can be copied and pasted on an Excel application. In fact the following budget forms can be added as needed, or the pieces can be put together as required.

Line Item Cost Breakdown
Total  Borrower Changes
Project Prepaid Budget
Costs Costs
Line Item Description
A. PRE CONSTRUCTION COSTS:
101 Architect, Engineering & Soils Study Fee
102 Design Review/Plan Check Fees
103 Permits - City/County
104 Utility Connection Fees
105 School/Park/Misc. Taxes
106 Project Bonds
TOTAL PRE-CONSTRUCTION COSTS $0 $0 $0
B. CONSTRUCTION COSTS:
General Requirements
201 Temporary Utilities & Facilities
202 Special Inspections/Testing-Geotech, Structural
203 Job Security
204 Equipment Rental
205 Jobsite Overhead
206 Project Management/Supervision
207 General Contractor's Office Overhead/Profit
208 State Sales Tax (where applicable)
210 Builder Contingency
SUB-TOTAL GENERAL REQUIREMENTS $0 $0 $0
Site Preparation
301 Demolition
302 Clearing/Stakeout
303 Rough Grading/Shoring/Excavation/Fill
304 Site Retaining Walls/Waterproofing/Backfill
305 Site Drainage
306 Private Septic System
307 Domestic Water Well
308 Pump House & Pressure Water System
309 Environmental
310 Off-Site Improvements
SUB-TOTAL SITE PREPARATION $0 $0 $0